My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO28252
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO28252
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:47:30 PM
Creation date
11/20/2007 9:11:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
Hydrology
Doc Date
12/23/1999
Doc Name
GROUNDWATER SURFACE WATER & PROCESS MONITORING PLAN
From
AMERICAN SODA LLP
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Deccmher 23, 1999 Pul,~c l0 <br />1 <br />1 <br /> <br /> <br />t~;~,,,..,, ,, c..,, <br />During the baseline period, groundwater levels will be measured monthly for all <br />monitoring well completions. This will include wells located in and out of the 0-5 year mining <br />panel. <br />During the first 5 years of commercial operations, water levels will be measured monthly <br />for all monitoring wells completed in zones above the Dissolution Surface (including in-panel and <br />out-ol=panel wells), and weekly (or monitoring wells completed at the Dissolution Surface. The <br />weekly water-level measurements for Dissolution Surface monitoring wells will be performed <br />using suitable automated data recording equipment. The automated equipment will not be <br />' installed until the beginning of commercial operations. <br />Pnt•uchulc Silc <br />Once the alluvial monitoring well is constructed at the Parachute Site, water level will be <br />measured on a monthly basis. Water-level monitoring will be conducted in accordance with the <br />procedures detailed in Appendix 4. <br />Domestic Hoc//.r <br />Water levels will be measured in the available domestic wells contained in this Water <br />Monitoring Plan on a monthly basis, and will be performed in accordance with the procedures <br />' detailed in Appendix Q. <br />2.2.1 Grnrutrhan/er Qtrnliry Mrurimriag <br />' Groundwater quality will be monitored at the Piceance Si[e, the Parachute Site, and in <br />domestic water wells. This section includes details regarding water-quality parameters to be <br />' measured in water samples, groundwater quality monitoring schedules, and groundwater <br />monitoring procedures. <br />Gr•oundwnler Uunlit}~ Purnmelc~r•s <br />The monitoring schedule allows for water quality samples to be analyzed for either the <br />' standard list of parameters contained in WQI (Table 2) or the comprehensive list of parameters <br />contained in WQ2 (Table 3). In general, water quality samples will be analyzed for the WQ2 <br />' parameters on a less frequent basis that the WQI parameters. The two lists of parameters were <br />developed in consultation with the BLM, GPA, CDMG, USGS, Rio 131anco County, and American <br />' Soda. These parameters are generally in accordance with applicable water-quality parameters <br />listed in the Colorndo Deparunent of Public Health and Cnvironment (CDPHG), Water Quality <br />1 <br />' Agapito Associates, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.