My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE66136
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE66136
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:12:03 PM
Creation date
11/20/2007 9:11:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002114
IBM Index Class Name
Permit File
Doc Date
2/10/2003
Doc Name
Preliminary Adequacy Review (PAR) Response
From
DMG
To
Greg Lewicki and Associates
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 03a <br />Date : 02/10/2003 <br />User : GRM <br />State :Colorado <br />County :Mesa <br />Site :15 Road~Gravel Pit <br />PermiUjob# : M-2002-114 <br />Abbreviation :none <br />Filename : M114-03a <br />Agency or organization name :DMG <br />Permit or other job action :Final Reclamation Costs Estimate <br />Task description :regrade Sediment pond area <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series 11 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $50.51 NA <br />Operating cost/hour : $63.93 100 <br />Ripper op.cosUhour : $3.78 50 <br />Operator cosUhour : $30.65 NA <br />Total unit cosUhour : $148.87 Total fleet cost/hour : $148.87 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,000 LCY factor : NA ~ volume : 1,000 LCY <br />Source of estimated volume :operator provided <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 50 feet <br />Unadjusted hourly production : 1,400.0 LCY/hr <br />Material consistency description <br />Wet, highly cohesive <br />Average push gradient : 0.00 % (i <br />Average site altitude : 4,460 feet <br />Material weight : 3,400 Ibs/LCY <br />Weight description <br />Sand and gravel -Wet <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.395 /LCY <br />8SU Horsepower : 310 <br />Operator skill : 0.75 (aG <br />Material consistency : 0.80 (Cat <br />Dozing method : 1.00 (ge <br />Visibility : 1.00 (av <br />Job efficiency : 0.83 (lshif <br />Spoil pile : 0.80 (fnc <br />Push gradient: 1.00 (Cat <br />Altitude : 1.00 (Cat <br />Material weight: 0.68 (Cat <br />Blade type : 1.00 (S/S <br />Net correction : 0.27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.