Laserfiche WebLink
~P <br />• EY.f:IbIT - bllnin•lan _ See narrative <br />attached. <br />1, Dates of Mining, beJyinning and ond, <br />Mining will not begin until pernit is granted, Aug. or <br />Sept. 19$$. <br />It is estimated that the gravel supply will last 20 years, <br />2. Description of depth of top soil & how stored. <br />This is a creek bottom operation. There is no top soil. <br />3. Description of .overburden <br />There is no overburden <br />4. Tkickness of Gravel layer. <br />Testing indicates a gravel layer of from 4'to $~~, <br />5. Description of roads to & iroa pit - Show on map - Ex E <br />. Pit area borders on county road V and 13, No haul road will <br />be needed. <br />6. Skow disturbance to land surface. <br />The ohly land surf ace 'disturbed will be the creek bottom <br />itself. <br />~. Show dimensions of oxiating and proposed roads that <br />will be used, <br />None needed. <br />8. Specify how ouch water will be used, if any. <br />No water will be used in this operation. <br />9. Describe any around water and/or the affect. <br />This is a dry creek. The only time there is any water is <br />following a heavy rain. <br />10. Describe if will comply with Colorado YJater Laws. <br />Yes. There will be no conflict. <br />11. Describe whether Gravel will be processed on site, <br />Gravel will not be processed. Used as mined. <br />