Laserfiche WebLink
' EXHIBIT '~- Reclanation Plan <br />~ 1, Description -_..of how will handle overburden <br />A creek bottom operation. There is no overburden <br />2, Thickness of top soil to be replaced: , <br />A creek bottom operation. There is no top soil, <br />3. Describe bradient of reclaimed elope. <br />No slope will be left steeper than4;1. When flooding <br />completes the reclamation the original slope will be.meintained. <br />b. Desaribe seeding operation ' <br />",~C None required. <br />§. Describe brass, forb, akrub and free specie: <br />None, in creek bottom. No trees in area. Natural vegetation <br />is present on the banks of the creek. <br />6. De=cribs the application sacuw~i method of aeedina <br />No seeding in creek bottom. <br />7. Describe the mulch: <br />No mulch. <br />8. Desaribe and roads, streams do ponds that x111 remain: <br />No road will be built and none will remain other than the trail <br />road used by the owner. ~~ <br />9. Describe how any left over rock etc. x111 be handled. <br />Any rock or unsightly material will be buried or hauled <br />to another site for disposal. <br />10. Financial xarranty for private operators: <br />NA <br /> <br />'~ PLEASE SEE RECLAMATION PLAN NARATIVE ATTACHED. <br />