My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE66125
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE66125
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:12:03 PM
Creation date
11/20/2007 9:10:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002111
IBM Index Class Name
Permit File
Doc Date
10/14/2003
Doc Name
Revised Permit Application form and bond calc
From
Greg Lewicki and Associates
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRGES Cost Estlmatina Software <br />Task#: 03a ,State `. Colorado PerrniUob#;M-2002-111 <br />Date: 09/22/2003 County:Mesa Abbreviation :none <br />User : SSS Site : Gilsonite Pit Filename :M111-03a <br /> <br />Agency or organization name : DMG <br />Permit or other job action : New 112c permit <br /> Task description : BacM1111200' max of Phase 3 hlghwall from 1H:1V to avg. 4H:1 V <br />HOURLY EQ UIPMENT COST <br /> Basic machine :Cat D9R - 9SU Horsepower : .405 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 :ROPS Cab Shift basis : 1 per dey <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br />.. ~ ~ ~ UfllizaUon <br /> Cost Breakdown : Ownership cosUhour : $51.07 NA <br /> Operafing cosf/hour: $97.71 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator wst/hour: $31.83 NA <br /> Tofal unit cost hour ~: $180.61 Total fleet cost/hour : $180.61 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 48,888 LCY factor :. NA volume : 48,888 LCY <br /> <br />Source of estimated volume :Exhibit L <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION <br />Operator skill : 0.75 <br />Material consistency ; 1.20 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.85 <br />Blade type : 1.00 <br />Net correction : 0.51 <br />Source <br />Average push distance : 50 feet <br />Unadjusted hourly production : 2,110.5 LCY/hr <br />Material consistency description <br />Average push gradient : 0.00 % (1 <br />Average site altitude : 4,455 feet <br />Material weight : ~ 2,700 Ibs/LCY <br />Weigh description <br />Sand and'clav -Loose <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.168 /LCY <br />Adjusted unit production : 1074.00 LCYIhr <br />Adjusted fleet production : 1,074.00 LCY/hr <br />Total job time : 45.52 Hours <br />Total job cost : $8,222 <br />
The URL can be used to link to this page
Your browser does not support the video tag.