My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE66058
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE66058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:12:00 PM
Creation date
11/20/2007 9:09:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
SECTION 2.05 REQUIREMENTS FOR OPERATION AND RECLAMATION PLANS
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Reclamation of sediment ponds 3, 4 and 5 shall be accomplished after <br />successful revegetation is assured. Sufficient yardage exists in the berms <br />of the ponds to provide the fill needed to reclaim the ponds. A bulldozer <br />shall be used to push the berms into the ponds and bring the local area back <br />to approximate original contours. <br />During final reclamation the Hubbard Creek Crossing will be removed. <br />The material backfilled around the culvert will be graded into the road cut <br />on the east sides of the Creek. Dozers and excavators shall be used to accomplish <br />this work. <br />Areas for reclamation were calculated as follows: <br />Bench stabilization 3.4 acres <br />Initial Reclamation - portal bench, <br />bench access road, lower stockpile, <br />scale locations at the mine site and <br />by the highway and Pond No. 1 13.0 acres <br />. Final Reclamation - Pond Nos. 3, 4 and <br />5, Pond No. 1 access road and the <br />Hubbard Creek Crossing 1.2 acres <br />Because the so 11 surveys conducted on the site indicate that the existing <br />disturbed soils are suitable plant growth media, and because the disturbed <br />area is less than 40 acres, the Blue Ribbon Mine will be reclaimed and revegetated <br />using existing materials with sufficient amendments to achieve adequate re- <br />establishment of vegetation to meet the requirements of the CMLRD and the land- <br />owner's postmining land use objectives (wildlife habitat). When the surfaces <br />are regraded to approximately their final contour, at lease one soil sample per <br />• <br />109 (Rev. 3/21/86) <br />
The URL can be used to link to this page
Your browser does not support the video tag.