Laserfiche WebLink
<br />-4- <br />Nava & Exhibits• <br /> <br />Submit TWO (21 complete, unbound covies of the following application exhibits: <br />6.3.1 EXBIBIT A - Legal Description and Location Nap <br />6.3.2 EXHIBIT B - Site Description <br />6.3.3 EXHIBIT C - Nining Plan <br />6.3.4 EXHIBIT D - Reclamation Plan <br />6.3.5 EXHIBIT E - Rape <br />6.3.6 EXHIBIT F - Liat of Other Permits and Licenses Required <br />6.3.7 8$SIBIT G - Source of Legal Right-to-8nter <br />6.3.8 HXHIBIT H - Municipalities Within a Two-mile Radius <br />6.3.9 EXHIBIT i - Proof of Filing with County Clerk <br />6.3.10 EX8I8IT J - Proof of Mailing Notices of Permit Application <br />6.3.12 E$SIBIT L - Permanent Man-Made Structures <br />6.1.2(1)(b) ADDENDOM 1 - Notice Requirements (sample enclosed) <br />6.5 Geotechnical Stability Exhibit (as required) <br />Resvonsibilities as a Permittee: <br />IIpon application approval and permit issuance, this application becomes a legally <br />binding document. Therefore, there area number of important requirements which <br />you, as a permittee, should fully understand. These requirements are listed <br />below. Please read and initial each reQUirement, in the space provided, to <br />acknowledge that you understand your obligations. If you do not understand these <br />obligations then please contact this Office for a full explanation. <br />~~1. Your obligation to reclaim the site is not limited to the amount of the <br />financial warranty. You assume legal liability for all reasonable expenses <br />which the Board or the Office may incur to reclaim the affected lands <br />associated with your mining operation in the event your permit is revoked <br />and financial warranty is forfeited; <br />2. The Board may suspend or revoke this permit, or assess a civil penalty, <br />upon a finding that the permittee violated the terms or conditions of this <br />permit, the Act, the Mineral Rules and Regulations, or that information <br />contained in the application or your permit misrepresent important material <br />facts; <br />p~ 3. If your mining and reclamation operations affect areas beyond the <br />boundaries of an approved permit boundary, substantial civil penalties, to <br />you as permittee can result; <br />~,~~ 4. Any modification to the approved mining and reclamation plan from those <br />described in your approved application requires you to submit a permit <br />modification and obtain approval from the Board or Office; <br />pL~ 5. It is your responsibility to notify the Office of any changes in your <br />address or phone number; <br />~~ 6. Upon permit issuance and prior to beginning on-site mining activity, <br />you must post a sign at the entrance of the mine site, which shall be <br />clearly visible from the access road, with the following information (Rule <br />3.1.12): <br />