Laserfiche WebLink
The ditching of the runoff in this area into the watershed of <br />• Sedimentation Pond 002 will have minimum effect on the ponding capacity or <br />treatment capabilities of Sedimentation Pond 002. The watershed size for <br />Pond 002 will be increased from 2098.92 acres to 2147.63 or an approximate <br />2 percent increase. This watershed is in the upper portion of Pond C02 <br />watershed. After routing the runoff thror:oh the pond, it has been <br />determined to only increase the peak stage a few inches and not affect the <br />basin trap efficiency at all. Therefore, the construction of this ditch <br />and culvert will have negligible effect on the performance of <br />Sedimentation Pond 002. <br />• <br />C 1 <br />A-5 02/13/87 <br />