Laserfiche WebLink
Trapper Mine Underground Feasibility Study First NOI--Reclamation Costs <br /> Surface Disturbance (acres) Reclamation Costs <br />Drill Drill Access Regrade Disking Seeding Seed <br />Hole No. Site Road Total Cost`' Cost`Z Cost*' Cost`6 <br />05-LW16 0.23 0.16 0.39 $432.64 $13.03 $27.59 $101.54 <br />05-LW17 0.23 0.00 0.23 $432.64 $7.69 $16.27 $59.88 <br />05-LW 18 0.23 0.00 0.23 $432.64 $7.69 $16.27 $59.88 <br />05-LW 19 n/a 0.00 0.00 n/a Na Na n/a <br />05-LW22 n/a 0.00 0.00 Na Na Na n/a <br />Total 0.69 0.16 0.85 $1,297.92 $28.41 $60.14 $221.31 <br />Reclamation Costs Total = $1,608 <br />`' Assume 2 hrs per drill site @ $216.32 per hour (see Trapper TR-96 Permit Table 1.4-4). <br />`s Assume $33.42/ac (see Trapper TR-96 permit table 1.4-12). <br />`3 Assume $70.75/ac (see Trapper TR-96 permit table 1.4-12). <br />`4 Assume $260.36/ac (see Trapper TR-96 permit table 1.4-14). <br />