Laserfiche WebLink
<br />-3- <br />determined: <br />b) 'Ihe Board will enter the lands to perform reclarrra>;on only if the Board has <br />i. that reclamation required by law to have been performed upon such lands has <br />not been perfomred, and <br />u. that fmarrcial warrarrty forEei[ure proceedings described in the Act or similar <br />provisicas of subsequerrt laws, if any, have bear initiated. <br />c) 'Ihe Division, aamg for the Board, will enter lands to respond to an emergency only <br />where the Division determines that any of the conditions of Construc~on Material Rule 8.4.2. exist. <br />'7) 'Ihe add~iooal oondrtions set forth in the attached rider, if any, are incorporated herein by <br />reference. <br />/_/ a) Rider is attached. <br />/ XX / b) No rider is attached. <br />MINED LAND RECLAMATION BOARD <br />COLORADO DEPARTMENT OF NATURAL RESOURCES <br />MICHAEL B. LO <br />Division Director <br />