Laserfiche WebLink
<br />EXHIBIT L: Reclamation Costs <br />Ormiston Gravel Pit, M-94-048 <br />Total Permit Area = 28.0 acres <br />Affected Mining Area (total area to be reclaimed) = 28.0 acres <br />Estimated cost per acre. <br />- mobilization $ 215.00 <br />-grading $ 1,150.00 <br />- seeding @ -24Ibs/acre -seed cost $ 47.00 <br /> -broadcast seed $ 130.00 <br />- discing and/or raking $ 190.00 <br />- mulching @ 2 tons/acre -mulch $ 336.00 <br /> -application $ 150.00 <br />- miscellaneous freight and handling $ 225.00 <br />Total cost per acre <br />$ 2,243.00 <br />Total Reclamation cost for Phase 1 at 28 acres = $62,804.00 <br />