Laserfiche WebLink
CAM Mining LLC <br />Water Sampling Report <br />Date: 06/19/06 <br />Weather Conditions: Windy - 90+ degrees F. <br /> Surface Water <br />Sample <br />Point Time Flow <br />cfs H <br />p EC <br />umhos/cm Tem C <br />p ( ) <br />SW-1 1:10 PM 0.8 8.2 2600 24.6 <br />SW-2 1:15 PM Dry - - - <br />SW-3 11:12 AM D - - - <br />SW-4 10:51 AM Dry - - - <br />SW-5 1:15 PM Dry 'i - - - <br />SW-6 11:30 AM ~. Dry--- - i - - - <br />SW-7 11:30 AM D - - - <br />SW-8 11:04 AM 0.10 8.2 2800 17.7 <br /> <br /> Ground Water <br />Sample <br />Point <br />Time SWL <br />feet <br />pH EC <br />umhos/cm <br />Temp (C) <br />GW-1 12:48 PM 8.6 7.2 4600 14.7 <br />GW-3 11:55 AM 36.5 7.0 4200 17.3 <br />GW-6 12:49 PM Dry-18.8' - - - <br />Location of Points/Wells <br />SW-1 East Salt Creek above Mi <br />SW-2 McClane Creek at culvert <br />SW-3 Munger Creek at haul roa <br />SW-4 East Salt Creek -2 miles <br />SW-5 McClane Creek above mi <br />SW-6 Munger Creek below mini <br />SW-7 Munger Creek above Min <br />SW-8 East Salt Creek between <br />SW-X McClane Creek at conflue <br />:lane under haul road bridge <br />Below mine <br />culvert below mine <br />ownstream of SW-8 <br />e site at culvert inlet <br />before north split <br />3er and McClane Creeks at bridge <br />with East Salt Creek <br />Second Quarter 2006 <br />Sampled by: Jim Stover <br />Meters Calibrated: Yes <br />GW-1 Alluvium of East Salt Creek about 3 Miles above McClane - TD 14.3' <br />GW-3 Alluvium of East Salt Creekjust below Munger Canyon - TD 47.3' <br />GW-6 In Munger Canyon at the permitted waste rock disposal area - TD 18.8' <br />Feet <br />GW-1 Total Depth 14.3 <br />GW-3 Total Depth 47.3 <br />GW-6 Total Depth 18.8 Depth revised when pipe was damaged <br />during gob pile Construction. <br />