Laserfiche WebLink
Page 121 <br />Construction Materials Rule 6 <br />shall be twice the rate required for seed drilling. If the seedbed <br />has not been adequately roughened prior to seeding, the seed <br />shall be raked or harrowed after broadcast application; <br />(v) if a mulch is needed, specify the kind to be used, <br />the crimping method, and rate of application; and <br />(vi) explain the establishment methods for each <br />species of shrub and/or tree, and state the number of each to be <br />established per acre. <br />(d) Specify which ponds, streams, roads and buildings, if <br />any, will remain after reclamation. These features must be shown on <br />the Exhibit E -Map. If ponds are part of the Reclamation Plan, slopes <br />from 5 vertical feet above to 10 vertical feet below the expected <br />average water level cannot be steeper than 3H:1 V; remaining slope <br />lengths may not be steeper than ZH:1 V. Where wildlife habitat is the <br />proposed future land use, shorelines should be irregularly shaped to <br />promote a diverse wildlife habitat. The Colorado Division of Wildlife <br />(DOW) must be consulted where wildlife use is the proposed future <br />land use, <br />(e) Specify the reclamation treatment of any waste rock <br />dumps, underground mine openings, ditches, sediment control <br />facilities, buildings and other features specified in your mine plan but <br />not previously addressed in the Reclamation Plan narrative. These <br />features must be shown on Exhibit E -Map. This should describe the <br />measures taken to minimize disturbance to the hydrologic balance, <br />prevent off-site damage, and provide for a stable configuration <br />consistent with the proposed future land use. <br />I I7(4)(a) (f) All Limited Impact 110 applications must provide an <br />estimate of the actual costs to reclaim the site based on what it would <br />cost the state using an independent contractor to complete reclamation. <br />Include the unit costs for the following activities as appropriate to the <br />operation: backfilling, grading, topsoil application, seeding, mulching, <br />fertilization, and labor [o complete reclamation. Determine and specify <br />the point during the operation when the site has reached a point of <br />