Laserfiche WebLink
• <br />DRAINAGE <br />Water Diversions and, or, other on-site runoff controls will be constructed as part of <br />the mining operations and final reclamation (SEE EXHIBIT E- 4 & 5). <br />Along the East and North side of the property a 2 foot high earthen berm with a 4 foot <br />high, 4 strand barbed-wire fence will be constructed to eliminate off-site drainage. On <br />• the west side of the property a 2 foot high silt fence along with the 4 foot high, 4 strand <br />bazbed-wire fence will be constructed to eliminate on-site drainage from leaving the site. <br />(SEE EXHIBIT E-4) <br />Page I5, CUP <br />u <br />