Laserfiche WebLink
QUARTERLY SAE INSPECTION REPORT <br />Identification <br />During Inspection: <br />mate Water Level <br />nt (% total storage) <br />(cfs) <br />CAM Minin LLC Quarter: First <br />Mun er Can on Mine C-81-020 Inspection Date: 24-M <br />SAE 1 SAE 2 SAE 3 SAE 5 Sediment Pond <br />Mine Loma Dirt Fan Refuse Pile <br />Snow & Ice D D Snow Pool <br />t)% ~% ()% t)% 0% <br />0 0 0 0 0 <br />Yes/No <br />Rills & Gulleys <br />Inadequate Vegetation <br />Outlet Channel Erosion <br />Burrows <br />No <br />Differential Settling <br />Cracks or Slides <br />Seepage <br />purtenant Structures <br />Defective Spillways <br />Dewatering Devices Clogged <br />Faulty Gates, Etc. <br />Other <br />Comments <br />Required: <br />Permit Reference <br />oflnspector: Jim Stover <br />No No No No No <br />No No No No No <br />No No No No No <br />I No ~ No I No I No i Noll <br />No No No No No <br />SAE-0 -Topsoil is no longer required. See Volume V, Appendix M(viii)-4 <br />Vegetation is adequate to control erosion. <br />Pool in refuse pile sediment pond is about 1 foot below primary spillway. <br />None <br />eO~Q© <br />Volume V, Appendix M (viii), & Volume II Figure 2.$~R- ,°pO <br />epd e ~,S <br />~V eQ <br />'*~ f <br />~ . E. ti <br />P. E. <br />