Laserfiche WebLink
PRO-PANEL STOPPING CONSTRUCTION <br />~e <br /> <br />,; c c c ~ . <br /> c c c <br /> A A A ~ <br /> C C C <br /> C C C <br />~i , <br />SEAL AN7 IS USED IN dLL 4R£AS <br />MATERIALS LIST ~ WMERE LEAKdGE OCCURS. <br />A - TREATED TIMBER POSTS <br />s- <br />B - TREATED WEDGES <br />C - 29 GAUGf STEEL PANELS (39" W x /2~ L1 <br />CONSTRUCTJON PROCEDURE <br />The mete/ ponNa on orerlopped and attached fo fhs -imber poaf by voila or <br />scnrs. The pane/a are -rimmed on aides and coda, There nsceaaary, fo provide <br />fora -iphf fit opoinaf fhs riba,lloor, and roof. Doors and door supporfa <br />rill be ina-olled of neceaaary. <br />NOTE <br />1. THESE STOPPINGS ARE TO BE USED IN <br />SNORT-LIVED AREAS OF LESS THAN <br />TWO YEARS LIFE EXPECTANCY. <br />2. TREATED MEANS MSHA APPROVED <br />F/RE RETARDAN r. <br />