Laserfiche WebLink
PEABODY COAL COMPANY <br />YESTERN DIYISION 1987 <br />CERTIFICATION DATE: June 16~ <br />SEDIMENT CONTROL STRUCTURE CERTIFICATION <br />,• <br />RE: MINE NuCld Mine <br />STRUCTURE ID Sedimentation Pond N006 <br />A REVIEW OF AVAILABLE CONSTRUCTION REPORTS, FIELD DATA AND AS-9UILT CALCULA- <br />TIONS FOR THE ABOVE STRUCTURE HAS BEEN PERFORMED. EXCEPTION NOTED BELOW <br />ARE, IN THE OPINION OF THE UNDERSIGNED, NOT CONSIDERED TO MATERIALLY AFFECT <br />THE PERFORMANCE OR STABILITY OF THE STRUCTURE. THE STRUCTURE AS~ONSTRUCTED <br />IS TO THE BEST Of MY KNOWLEDGE IN CONFORMANCE WITH THE REGULATIONS AND THE: <br />INTENT OF THE APPROVED DESIGN PLANS AND SPECIFICATIONS. <br />EXCEPTIONS: Storage capacity dedicated to pit pumpage is approximately <br />0.94 ac.-ft. vs. 1.10 ac.-ft. in the design. <br />COMMENTS: See Exhibit "7-6b1" for the "AS-Built" site conditions, Pond <br />1W06 should be inspected periodically; in accordance with the approved <br />Mine Permit, for stability and capacity conditions. <br />~. <br />