My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE65651
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE65651
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:11:24 PM
Creation date
11/20/2007 8:59:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999025
IBM Index Class Name
Permit File
Doc Date
7/1/1999
Doc Name
Soaring Eagle Gravel Pilt File number m-99-025 Reclamation Bond Estimate
From
DMG
To
Grand Junction Pipe and Supply
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of4 <br />ado Division of Minerals and Geol o9Y <br />RECLAMATION COST SUMMARY FORM <br />_____________________________ <br />PERMIT NUMBER M-99-025 PREP. 8Y: SSS FILENAME: M025-0 <br />DATE 28-Jun-99 OPERATION: Soaring Eagle Gravel Pit <br />PERMIT ACTION New 112c Application <br />GRAND TOTAL BOND AMOUNT $116,322 <br />I. DIRECT COSTS =___________ <br />________________________________________________________________________ <br />________________________________________________________________________ <br />A. EARTHNORK - BACKFILLING & RWGH GRADING <br />Task No.~ Task Description J Cost (S) <br />1a I Pump down Lake to allow for backfilling and I 58,611 <br />topsoil application (incl. wetland construction) <br />in Phase V. Pump 116,972,539ga1 iJ 350,000 gph <br />334 hrs iJ 825,78/hr. <br />J <br />2a J Create wetland by backfitli ng avg. 650' x 60 area) 56,723 <br />to a depth of 8'. <br />Subtotal (A ): 515,334 <br />B. EARTHWORK - HIGHNALL REDUCTION <br />Task No.J Task Description ~ Cost (S) <br />________I__.._,._________________..________.,_________________.,J_______„____ <br />3a J Backfill Phase V slopes to a 3:1 grade by hauling) 817,635 <br />J material from phase IV excavated area. Scraper <br />haul distance of 900' average. J <br />J <br />J <br />Subtotal (B): 817,635 <br />C. EARTHWORK - WASTE PILE COVER PLACEMENT <br />Task No-J Task Description ~ Cost (S) <br />Subtotal (C): <br />
The URL can be used to link to this page
Your browser does not support the video tag.