Laserfiche WebLink
PERIODIC INSPECTION FORM <br />Stockpoads or Sumps <br />INSPECTOR'S NAME: Mi h eel Al av'31a <br />FACILITY CONFIGURATION: Stocknond <br />SITE NAME: T-28 <br />MINE NAME: Seneca II <br />MINE I.D. NO.: C-80-005 <br />DATE: 09/22/99 <br />DATE LAST INSPECTION: 06f29f9a <br />LOCATION: SF.3r~~ Sec 2. T5N R87W <br />LOCATION: 7.1 mi SE of HaydPjl, CO <br />OWNER'S REP.: Brad Brown Ge^ Mq~_ <br />1. Angle of slope: 3:1 upstream, a:1 downstream Total = 7:1 N/A <br />2. *Seepage (specify location, color, and approximate volume) <br /> At isolated points on embankment slopes: Yes ~ N/A <br /> At natural hillside: Yes N~ N/A <br /> Over widespread areas: Yee OOO <br />ENO) N/A <br /> From downstream foundation area: Yes o N/A <br /> "Boils" beneath stream or ponded water: Yes o N/A <br />3. Cracks or scarps on treat: Yee o N/A <br />4. Cracks or scarps on slope: Yes o N/A <br />5. Sloughing or bulging on elope: Yee ~ N/A <br />6. *Major erosion problems: Yes ~ N/A <br />7. Surface movements in valley bottom or on hillside: Yee ~ N/A <br />8. *Erosion of toe: Yes 101 N/A <br />9. *Water impounded against downstream toe: Yes ~ N/A <br />30. Existing embankment freeboard: Annroximately ~_ feet <br />11. Increase Decrease in water level: Nn change feet <br />12. Cracks, bulging, or erosion on upstream face: Yee o N/A <br />13. Spillway erosion: Yes o N/A <br />14. *Clogging <br /> Spillway channels: Yee N/A <br /> Diversion ditches: Yee ~ <br />o N/A <br />*Major adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse <br />conditions noted in these items should normally be described (extent, location, volume, <br />etc.) in the apace on the back of this sheet. <br />