My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO28130
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO28130
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:47:25 PM
Creation date
11/20/2007 8:59:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Hydrology
Doc Date
12/6/1999
Doc Name
3rd Qtr 1999 Inspections
From
SENECA COAL CO
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERIODIC INSPECTION FORM <br />Stockponds or Sumps <br />INSPECTOR'S NAME: M' ha ] At av;tta <br />FACILITY CONFIGURATION: Stoc and <br />SITE NAME: T-17 <br />MINE NAME: S neca S7 <br />MINE I.D. NO.: c-80-005 <br />1 <br />2 <br />DATE: 09/22 ~, 9 <br />DATE LAST INSPECTION: ~fi/29~99 <br />LOCATION: sW~rSW3~ _cec 72 TSN RA7w <br />LOCATION: 7.1 mi cc of Havd n CO <br />OWNER'S REP.: Brad Brown, C-Pn Mq~_ <br />Angle of slope: 3:1 upstream, ael downstream <br />*Seepage (specify location, color, and approximate volume) <br />At isolated points on embankment elopes: <br />At natural hillside: <br />Over widespread areas: <br />From downstream foundation area: <br />"Boils" beneath stream or ponded water: <br />3. Cracks or ecarpe on crest: <br />4. Cracks or ecarpe on elope: <br />5. Sloughing or bulging on elope: <br />6. *Major erosion problems: <br />7. Surface movements in valley bottom or on hillside: <br />8. *Erosion of toe: <br />9. *water impounded against downstream toe: <br />10. Existing embankment freeboard: see commments <br />11. Increase Decrease in water level: <br />12. Cracks, bulging, or erosion on upstream face: <br />13 <br />14 <br />Spillway erosion: _ <br />*Clogging <br />Spillway channels: <br />Diversion ditches: <br />Yes /701 <br />Yes ~No <br />Yee No <br />Yes <br />Yes l~o <br />Yea <br />Yee ©o <br />Yes N~ <br />Yea <br />Yea ©o <br />Yes N® <br />Yea <br />__ feet <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />feet <br />Yee o N/A <br />Yes N N/A <br />Yes Mto' N/A <br />Yes ~tiol N/A <br />*Major adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse <br />conditions noted in these items should normally be described (extent, location, volume, <br />Total = 7:1 N/A <br />etc.) in the apace on the back of this sheet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.