Laserfiche WebLink
PERIODIC INSPECTION FORN <br />Stockponds or Sumps <br />INSPECTOR'S NAME: Michael Al av'11a <br />FACILITY CONFIGURATION: Stockpoad <br />SITE NAME: T-12 <br />MINE NAME: c_eneca rI <br />MINE I.D. NO.: c-80-005 <br />DATE: 09/22/99 <br />DATE LAST INSPECTION: 06/29/99 <br />LOCATION: Nwk¢.dr. c T5N 8B7w <br />LOCATION: 7.1 mi _cE of Hayden CO <br />OWNER'S REP.: Brad Brown,_,_{_en Mqr <br />1. Angle of elope: 3e1 upstream, 3:1 downstream Total = 6:1 N/A <br />2. *Seepage (specify location, color, and approximate volume) <br /> At isolated points on embankment slopes: Yes Igo N/A <br /> At natural hillside: Yee No N/A <br /> Over widespread areas: Yes ~ N/A <br /> From downstream foundation area: Yee ® N/A <br /> "Boils" beneath stream or ponded water: Yes ® N/A <br />3. Cracks or scarps on crest: Yee ® N/A <br />4. Cracks or scarps on elope: Yea 1~o N/A <br />5. Sloughing or bulging on elope: Yee ® N/A <br />6. *Major erosion problems: Yee N N/A <br />7. Surface movements in valley bottom or on hillside: Yee o N/A <br />B. *Eroeion of toe: Yes Q N/A <br />9. *Water impounded against downstream toe: Yee N® N/A <br />10. Existing embankment freeboard: Anr,roximately _Z feet <br />11. Increase Decrease in water level: Nn change feet <br />12. Cracks, bulging, or erosion on upstream face: Yea ® N/A <br />13. Spillway erosion: Yee No N/A <br />14. *Clogging <br /> <br /> Spillway channels: Yee ~ N/A <br /> Diversion ditches: Yea N/A <br />*Hajor adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse <br />conditions noted in these items should normally be described (extent, location, volume, <br />etc.) in the space on the back of this sheet. <br />