Laserfiche WebLink
PERIODIC INSPECTION FORM <br />Stockponds or Sumps <br />INSPECTOR'S NAME: M'_ha 1 Al avi la <br />FACILITY CONFIGURATION: Stoc Bond <br />SITE NAME: T-7 <br />MINE NAME: c nor a_ II <br />MINE I.D. NO.: c-80-005 <br />DATE: 09/22/99 <br />DATE LAST INSPECTION: 06~~/44 <br />LOCATION: N€1~cWi~ c t7 TSN R87W <br />LOCATION: 7.1 mi cR of Haydan CO <br />OWNER'S REP.: Brad Brown,., - n Mq` <br />1. Angle of elope: 2.5:1 upstream, 3:] downstream Total = 5.5~i N/A <br />2. +Seepage (specify location, color, and approximate volume) <br /> At isolated points on embankment slopes: Yee ~ N/A <br /> At natural hillside: Yes No N/A <br /> Over widespread areas: Yee ~ N/A <br /> From downstream foundation area: Yes CIO N/A <br /> "Boils" beneath stream or ponded water: Yes ~ N/A <br />3. Cracks or scarps on crest: Yea ~~ N/A <br />4. Cracks or scarps on elope: Yes ~ N/A <br />5. Sloughing or bulging on elope: Yes ~ N/A <br />6. *Major erosion problems: Yes No N/A <br />7. Surface movements in valley bottom or on hillside: Yee ~ N/A <br />8. *Eroeion of toe: Yes N/A <br />9. *Water impounded against downstream toe: Yes ~ <br />o N/A <br />10. Existing embankment freeboard: A,ggroximate],y a.n feet <br />11. Increase Decrease in water level: No changes feet <br /> <br />12. Cracks, bulging, or erosion on upstream face: Yes ® N/A <br />13. Spillway erosion: Yes ~ N/A <br />14. +clogging <br /> Spillway channels: Yes N/A <br /> Diversion ditches: Yes ~ <br />o N/A <br />*Major adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse <br />conditions noted in these items should normally be described (extent, location, volume, <br />etc.) in the apace on the back of this sheet. <br />