Laserfiche WebLink
J~ <br />~~~ <br />OPERA? <br />MINE: <br />FOURTH QUARTER 2005 POND INSPECTION REPORT <br />Pond Inspection Date: December 7, 2005 <br />~i <br />POND IDENTIFICATION <br />TYPE OF POND <br />APPROXIMATE WATER LEVEL <br />SEDIMENT (% total storage) <br />OUTFLOW (cfs) <br />FEATURES <br />EROSIONAL <br />Rills & Gullies <br />Inadequate Vegetation <br />Outlet Channel Erosion <br />Burrows <br />Other <br />STRUCTURAL <br />Differential Settling <br />Cracks or Slides <br />Seepage <br />Other <br />APPURTENANT STRUCTURES <br />Defective Spillways <br />Dewatering Devices Clogged <br />Faulty Gates, Etc. <br />Other <br />MAINTENANCE REQUIRED <br />TERROR CREEK COMPANI' <br />TERROR CREEK LOADOUT <br />P-1 Dugout <br />Sediment Sediment <br />-1.0 ft. Dry <br /><5 % GS% <br />0 0 <br />No No <br />No Yes <br />No No <br />No No <br />No No <br />No No <br />No No <br />No No <br />No No <br />No No <br />No No <br />No No <br />No No <br />No No <br />ADDITIONAL COMMENTS: The design sediment level is 18" below the invert of the primary spillway <br />on P-1. Dugout pond repairs were completed, mulched and seeded during third quarter. Ponds are <br />maintained as designed and in accordance with the approved plan. <br />REFERENCE DRAWINGS: <br />Map 7 <br />Exh. 9, p. I1 <br />SWMP Controls: The SWMP control devices were inspected and all SWMP control devices were found to <br />be in good condition. See Map 14 for details. <br />Inspected By: <br />Under Direction of: <br />James A. <br />Benjamin L. Godwin ~ o~ a"-vib <br />Colorado Registered Pro sSfyltal Engineer <br />Coal Processors, Shippers & <br />43440 8ow(e Road <br />Paonla. Colorado 81428 <br />(970) 9295855 <br />Facsimile: (970) 929-6261 <br />,~~. <br />