My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE65556
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE65556
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:11:20 PM
Creation date
11/20/2007 8:55:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003091
IBM Index Class Name
Permit File
Doc Date
6/30/2004
Doc Name
Civil Details on Ditch Relocation
From
Scott Cox
To
DMG
Media Type
M
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Q <br />M <br />LO <br />LO <br />0 <br />0 <br />a <br />M <br />N <br />u) <br />l•i <br />a <br />L <br />C <br />U <br />0 <br />N <br />N <br />0 <br />0 <br />W <br />W <br />O <br />J <br />O <br />LL <br />W <br />W <br />W <br />O <br />0' <br />a <br />M <br />g <br />h <br />z <br />Z <br />t� <br />r <br />0: <br />CC....,......,,.. <br />1/2" <br />1/8 ' x <br />45' CHAMFER <br />FIELD MOLDED <br />(TYP) <br />(POURED) SEALANT <br />3/4 ' d <br />MIN. <br />(_V' <br />D D <br />WU <br />BACK -UP <br />MATERIAL <br />�o <br />NON - <br />EXTRUDING ° <br />�0 <br />PREMOLDED <br />FILLER p D <br />ISOLATION /EXPANSION JOINT <br />JOINT LAYOUT PLAN <br />SEAL AT <br />SEALED <br />CONC. PAVEMENT <br />CONSTRUCTION JOINTS <br />CONC. PAVEMENT <br />GROOVE o <br />(SEE SAWED GROOVE <br />& SEAL DETAIL) d D D d <br />q D <br />d d D d <br />D° D <br />D a D d° D d d d D a D a D D/8'0 x 18" LONG PLAIN 9 FORMED BUTT JOINT <br />PAINTED CONTRACTION JOINT <br />DOWELS ® 12' O.C. <br />CONTRACTION JOINT STANDARD CONSTRUCTION JOINT <br />1/4 " <br />1/8 x 45' CHAMFER FIELD MOLDED <br />(TYP.) (POURED) SEALANT <br />3/4 d p , <br />MIN. D ° <br />D \ <br />D D <br />3/8 '0 BACK -UP MATERIAL D- SLAB <br />+ THICKNESS <br />NOTE: <br />1. JOINT LAYOUT PLAN REPRESENTS THE MAXIMUM JOINT SEPARATION. <br />CONTRACTOR SHALL SUBMIT FINAL JOINT LAYOUT PLAN TO LAFARGE FOR <br />APPROVAL PRIOR TO CONSTRUCTION. <br />a <br />0 <br />1/8 (MIN.) <br />SAWED GROOVE & SEAL DETAIL <br />TYPICAL CONCRETE CHANNEL JOINTS <br />N. T. S. <br />DROP STRUCTURE PLAN <br />N i <br />9.6' <br />1.5 <br />N <br />2.0' <br />5' THICK CONCRETE <br />" >. ✓z:: <br />NOTE: <br />SEALED CONTRACTION JOINT <br />REQUIRED EVERY 10 LINEAR FEET. <br />SEALED ISOLATION /EXPANSION JOINT <br />REQUIRED EVERY 100 FEET. <br />STANDARD CHANNEL X- SECTION <br />N.T S 4 <br />j< LINED CHANNEL. SEE <br />NOTE p17 <br />C <br />6" THICK BED OF 3/4' <br />CRUSHED ROCK, TJ CONFORM <br />TO (COOT FILTER MATERIAL CLASS A, <br />SEE 703.09, PER JO &FCD) <br />COMPACT SUBGRADE AND GRAVEL <br />TO 95% OF MAXIMUM DENSITY PER <br />ASTM D -698. SEE NOTE N12. <br />NOTE: <br />1" CONSTRUCTION JOINTS SHALL BE USED WHEN OPERATIONS <br />ARE SUSPENDED FOR 30 MINUTES OR LONGER. JOINTS <br />SHALL ALIGN WITH CONTRACTION JOINT LAYOUT. <br />3" WIDE AND DEEP NOTCH <br />IN SIDES AND BOTTOM FOR <br />Y x 6' TREATED STOP LOGS. <br />WALL 4' LONG INTO FULL HEIGHT OF STRUCTURE. <br />BANK. 8" THICK SEE NOTE y�3. <br />�2' <br />FOOTING UNDER SEE NOTES FOR REBAR AND <br />WANG WALL WALL REQUIREMENTS. <br />r <br />TOP OF _ I — - - -- <br />BANK— <br />BOTTOM <br />OF CAITAL. - t -- <br />I 8' FACE WIDTH WARP CONCRETE TO TRANSITION <br />I I ��ff FROM CONCRETE CHANNEL TO <br />— I I DIVERSION STRUCTURE <br />FLOW <br />� I I <br />A I <br />6y1 6" <br />12' THICK WALL <br />L— -- ------ - - - - -- <br />��TOP OF FOOTER NOTES <br />1/4 12" THICK FOOTING EXTENDED AT SHALL BE 3 FT. 1) EXTEND TOP OF WALL 3" ABOVE BANK. <br />1/8 " x 45' CHAMFER FIELD MOLDED MINIMUM OF 6" BEYOND WALL BELOW CANAL BOTTOM <br />2) ALL WALLS AND BOTTOM SHALL HAVE <br />(TYP.) (POURED) SEALANT FOOTPRINT. ,y4 REBAR CENTERED AT 12' SPACING <br />8' 8' BOTH WAYS. <br />3/4 d ° PLAN TRANSITION <br />D D D p 3) SIDES AND BOTTOM OF DITCH <br />D ° TRANSITION SHALL BE 8' THICK WITH <br />° D + D= SLAB STEEL REINFORCEMENT AS NOTED IN ,y2. <br />3/8 "0 BACK -UP MATERIAL--__D D D D + THICKNESS <br />4) PLACE A MINIMUM OF 6" OF <br />3" WIDE AND DEEP NOTCH GRANULAR BEDDING UNDER <br />° FORMED BUTT JOINT IN SIDES AND BOTTOM FOR 8' g' FOOTING. <br />STANDARD CONSTRUCTION 2' z 6' TREATED STOP LOGS. 5) OVERLAP REBAR FROM WALLS <br />JOINT ONLY FULL HEIGHT OF STRUCTURE. INTO FOOTING BY BENDING BARS. <br />SEAL AT CONSTRUCTION JOINTS A MINIMUM OF 18" OF EXTENSION <br />TOP OF _ _ _ INTO WALL AND FOOTING. <br />BANK — — <br />— — — — — — — — — — — — — — — — — — - <br />RIPRAP PROTECTION �! 6) PLACE FOOTING A MINIMUM OF 3' <br />BELOW CANAL BOTTOM. <br />.y FLOW <br />BOTTOM /' ' _ - -� 7) CONCRETE SHALL MEET AS A MINIMUM <br />OF CANAL''-" — — — — — - CDOT CLASS B SPECIFICATIONS. <br />4871.88 EXTEND TOE AND WIMG <br />WALL FOOTINGS INTO <br />RIP RAP 10 FEET DOWNSTREAM OF CANAL BOTTOM 3 FT <br />STRUCTURE TO TRANSITION FROM END TO <br />CONCRETE TO EARTH BANK. 4871.88 FOOTER <br />GROUTED TYPE "L" (9 -INCH) (UD <br />& FCD GRADATION) 18" THICK ON <br />6" THICK LAYER OF 3/4' <br />CRUSHED ROCK <br />TOP OF BANK <br />#4 REBARS�'` <br />AT 8" O.C. <br />2' CL <br />k <br />#4 REBARS <br />AT 8" O.C. <br />SECTION A -A <br />N. T.S. <br />I <br />1.5 <br />t� <br />a, Z <br />W Q <br />4a- <br />1] <br />TAPER TOP <br />OF BANK <br />6" THICK BED OF 3/4' <br />CRUSHED ROCK, TO CONFORM <br />TO (COOT FILTER MATRIAL CLASS A. <br />SEE 703.09, PER UD d FCD) <br />COMPACT SUBGRADE AND GRAVEL <br />TO 95% OF MAXIMUM DENSITY PER <br />ASTM D -698. SEE NOTE #12. <br />SECTION B -B <br />N i S. <br />SECTION A -A <br />� / i �► li l i d <br />SEE DETAIL 434 <br />0 <br />e . <br />UNDERDRAIN DETAIL <br />NTS 44 <br />SEE DETAIL 434 <br />i <br />60' EASEMENT <br />_j <br />PROPOSED <br />CONCRETE <br />CHANNEL <br />2% SLOPF <br />603 LF RIGID 4' NON - PERFORATED/ <br />PVC PIPE ASTM D2729 FROM UNDERDRAINI. <br />MIN. SLOPE 2% <br />CHANNEL UNDERDRAIN SECTION r4 <br />N. T. S. (ZU4 <br />EXISTING <br />GRADE <br />NOTES <br />1. DURING CONSTRUCTION OF THE CONCRETE CHANNEL, THE CONTRACTOR SHALL: <br />A. INSTALL CHANNEL UNDERDRAIN FROM CONCRETE CHANNEL TO 20' BEYOND <br />60' EASEMENT LINE AS SHOWN. <br />8. CAP THE END OF 4" PVC PIPE. <br />C. PROVIDE 4" x 4' x 8' LONG MARKER POST, PAINTED GREEN, & CLEARLY <br />MARKED ' UNDERDRAIN FROM CHANNEL" BURIED 4' DEEP. <br />D. BACKFILL ENTIRE LENGTH OF PIPE, INCLUDING CAPPED END. <br />2. ONCE MINING OPERATIONS COMMENCE, LAFARGE SHALL: <br />A. EXCAVATE END OF 4' PVC PIPE. <br />B. REMOVE CAP AND PROVIDE POSITIVE DRAINAGE INTO THE MINED PIT. <br />C. IF PIPE LENGTH DOES NOT EXTEND INTO THE PIT SIDE SLOPE. LAFARGE <br />SHALL EXTEND PIPE AT 2% SLOPE IN ORDER TO DAYLIGHT PIPE AND <br />PROVIDE POSITIVE DRAINAGE INTO PIT. <br />D. IF PIPE LENGTH EXTENDS TOO FAR INTO THE PIT SIDE SLOPE, LAFARGE <br />SHALL CUT OFF EXCESSIVE LENGTH OF PIPE AS REQUIRED. <br />CONCRETE' <br />LINING <br />CULVERT CONNECTION I�t <br />N.T.S. , 4 <br />DRAINAGE <br />FABRIC c <br />✓ "' OVERLAP <br />y+ RIGID 4" NON- PERFORATED <br />PVC PIPE FROM UNDERDRAIN <br />3/4' TO 1 1 /2" + PIPE TO 20' PAST THE EDGE <br />WASHED ROCK o`i;� OF THE EASEMENT. <br />2% SLOPE TO <br />DRAINAGE FABRIC DAYLIGHT <br />\ 3 <br />\ �1 <br />PROPOSED MINED GRADE <br />20' <br />2 0' MIN. 6" OVERLAP <br />ALL SIDES <br />RIGID 4" PERFORATED PVC PIPE IN <br />UNDERDRAIN AREAS. (PERFORATIONS <br />DOWN) MIN. SLOPE 2% <br />UNDERDRAIN DETAIL <br />N T S 4 4 <br />4 x 4 MARKER <br />POST <br />/// Permit #: M' ZZ5 • I/-I/ Confidental ?: <br />\ / Class: Type -Seq.: <br />From: A�, To�M� <br />4" CAP Doc. Name: �firJ+ Q` dcy, <br />Doc. Date (If no date stamp): -Of <br />CIVIL DETAILS <br />SMITH AND EMMONS IRRIGATION <br />DITCH RELOCATION <br />DUCKWORTH PIT <br />WELD COUNTY, COLORADO <br />SCOTT, COX &ASSOCIATES, INC. <br />consulting engineers surveyors <br />1530 55th Street Boulder, Colorado 80303 <br />lk (303) 444 - 3051 <br />Designed by DPA Date Scale FPo ey Sheet C4 Drawing no. <br />Drawn by <br />JAS 5/5/04 AS NOTED e of C4 03532 -3 <br />Revision Description Date Project no. <br />Checked by WHM 1 REVISIONS 6 16 04 03532 <br />TOP OF BANK <br />#4 REBARS�'` <br />AT 8" O.C. <br />2' CL <br />k <br />#4 REBARS <br />AT 8" O.C. <br />SECTION A -A <br />N. T.S. <br />I <br />1.5 <br />t� <br />a, Z <br />W Q <br />4a- <br />1] <br />TAPER TOP <br />OF BANK <br />6" THICK BED OF 3/4' <br />CRUSHED ROCK, TO CONFORM <br />TO (COOT FILTER MATRIAL CLASS A. <br />SEE 703.09, PER UD d FCD) <br />COMPACT SUBGRADE AND GRAVEL <br />TO 95% OF MAXIMUM DENSITY PER <br />ASTM D -698. SEE NOTE #12. <br />SECTION B -B <br />N i S. <br />SECTION A -A <br />� / i �► li l i d <br />SEE DETAIL 434 <br />0 <br />e . <br />UNDERDRAIN DETAIL <br />NTS 44 <br />SEE DETAIL 434 <br />i <br />60' EASEMENT <br />_j <br />PROPOSED <br />CONCRETE <br />CHANNEL <br />2% SLOPF <br />603 LF RIGID 4' NON - PERFORATED/ <br />PVC PIPE ASTM D2729 FROM UNDERDRAINI. <br />MIN. SLOPE 2% <br />CHANNEL UNDERDRAIN SECTION r4 <br />N. T. S. (ZU4 <br />EXISTING <br />GRADE <br />NOTES <br />1. DURING CONSTRUCTION OF THE CONCRETE CHANNEL, THE CONTRACTOR SHALL: <br />A. INSTALL CHANNEL UNDERDRAIN FROM CONCRETE CHANNEL TO 20' BEYOND <br />60' EASEMENT LINE AS SHOWN. <br />8. CAP THE END OF 4" PVC PIPE. <br />C. PROVIDE 4" x 4' x 8' LONG MARKER POST, PAINTED GREEN, & CLEARLY <br />MARKED ' UNDERDRAIN FROM CHANNEL" BURIED 4' DEEP. <br />D. BACKFILL ENTIRE LENGTH OF PIPE, INCLUDING CAPPED END. <br />2. ONCE MINING OPERATIONS COMMENCE, LAFARGE SHALL: <br />A. EXCAVATE END OF 4' PVC PIPE. <br />B. REMOVE CAP AND PROVIDE POSITIVE DRAINAGE INTO THE MINED PIT. <br />C. IF PIPE LENGTH DOES NOT EXTEND INTO THE PIT SIDE SLOPE. LAFARGE <br />SHALL EXTEND PIPE AT 2% SLOPE IN ORDER TO DAYLIGHT PIPE AND <br />PROVIDE POSITIVE DRAINAGE INTO PIT. <br />D. IF PIPE LENGTH EXTENDS TOO FAR INTO THE PIT SIDE SLOPE, LAFARGE <br />SHALL CUT OFF EXCESSIVE LENGTH OF PIPE AS REQUIRED. <br />CONCRETE' <br />LINING <br />CULVERT CONNECTION I�t <br />N.T.S. , 4 <br />DRAINAGE <br />FABRIC c <br />✓ "' OVERLAP <br />y+ RIGID 4" NON- PERFORATED <br />PVC PIPE FROM UNDERDRAIN <br />3/4' TO 1 1 /2" + PIPE TO 20' PAST THE EDGE <br />WASHED ROCK o`i;� OF THE EASEMENT. <br />2% SLOPE TO <br />DRAINAGE FABRIC DAYLIGHT <br />\ 3 <br />\ �1 <br />PROPOSED MINED GRADE <br />20' <br />2 0' MIN. 6" OVERLAP <br />ALL SIDES <br />RIGID 4" PERFORATED PVC PIPE IN <br />UNDERDRAIN AREAS. (PERFORATIONS <br />DOWN) MIN. SLOPE 2% <br />UNDERDRAIN DETAIL <br />N T S 4 4 <br />4 x 4 MARKER <br />POST <br />/// Permit #: M' ZZ5 • I/-I/ Confidental ?: <br />\ / Class: Type -Seq.: <br />From: A�, To�M� <br />4" CAP Doc. Name: �firJ+ Q` dcy, <br />Doc. Date (If no date stamp): -Of <br />CIVIL DETAILS <br />SMITH AND EMMONS IRRIGATION <br />DITCH RELOCATION <br />DUCKWORTH PIT <br />WELD COUNTY, COLORADO <br />SCOTT, COX &ASSOCIATES, INC. <br />consulting engineers surveyors <br />1530 55th Street Boulder, Colorado 80303 <br />lk (303) 444 - 3051 <br />Designed by DPA Date Scale FPo ey Sheet C4 Drawing no. <br />Drawn by <br />JAS 5/5/04 AS NOTED e of C4 03532 -3 <br />Revision Description Date Project no. <br />Checked by WHM 1 REVISIONS 6 16 04 03532 <br />
The URL can be used to link to this page
Your browser does not support the video tag.