Laserfiche WebLink
11. Areas in welch charged holrs are awaiting linng <br />shall be guarded or barncaded antl posted or flagged <br />against unaulhpr~zed entry. <br />12. Where electric blasting a nerlormed, elemri< <br />circuits in egoipmenl in the ~mmedrele area to he <br />blasted shall be dc~e nergized. <br />17. Char gang operations where any exploswes are <br />used shall be suspendetl dunng elecincal storms. <br />14. Blast my cables shall he kept in good repair with <br />no bare wires exposed except (hose at the ends. <br />15. Electric detonators shall be shunted until con <br />nectetl to the blasting cable; and, the blase ng cable <br />shall be shunted umd connected to the battery Im- <br />mediately before tiring. <br />16. Detonator card shall not be used i! it has been <br />damaged. <br />17 Delay connectors for bring detonating cord shall <br />be treated and hantlled with the same precaution as <br />elect nc detonators. <br />18. Only a no nsparking implement shall be usetl to <br />punch holes in an explosive cartritlge. <br />19. Holds shall not be dulled where (here i5 danger <br />of intersecting a charged or mist ued hole. <br />20. No tamping shall be done do ectly on a capped <br />primer. <br />21 Vehicles shall not run over detonan ng cord at <br />any time. <br />22. Unused exploswes shall be removed to a safe <br />location alter blast holes are charged. <br />27. Ample warning shall be gwen before blasts are <br />tired and all persons removed Irom the area. <br />24. Misf uns shall he reported Io the proper au thonly <br />and shall be disposed of before any other work is <br />performed m the blasting area. <br />25 When wmvng at a roadblock, under no cucum- <br />stances whatsoever are you to move forward until the <br />roadbloc ker moves completely from his blocking <br />posh ion. <br />Page 18 <br />26 Power cables are tp be kept a minimum of 50 <br />leer from charged blast hales. <br />27. All vehicles cool a~ning exnloswes shall be clearly <br />marked. <br />28. Vehicles transporting explosives shall not have <br />1 any sparking materials exposed to the expl os wes. <br />'~ FRONT-END LOADERS <br />1. Except during mstructi on by aqualitietl person, <br />Iront~end loaders shall be operated by trainetl pe rson~ <br />eel only. <br />2. Loaders shall be inspected by a competent <br />person before operation and any delec is affecting <br />safety shall be reported and corrected promptly. <br />3. The standard checkbst shall be usetl in inspecting <br />the e4 mpment helore it is placed m opera bon. <br />4 Do not attempt to operate the controls of a <br />loader unless properly positioned in the seat with seat <br />bet is securely fastened. <br />5. Make sure all persons and oblec is are clear before <br />slnrting or moving the machine. <br />6. Sound horn [wire before any movement <br />7. The highspred range should be locked out for <br />close work in the pit. <br />$ When left una itendeQ the loader shall have [he <br />brake set, the bucket on the ground, and the trans <br />mission in neutral If on a grade, the wheels shall also <br />be blocked or turned toward a berm or embankment. <br />9. During pamming, the bucket w~tl be positioned <br />as near the ground as possible. <br />1 10. Speed limits on roadways shall be observed. <br />t 11. No person may enter the artmulat~ng hinge point <br />area of a loader without fns[ securing the safety lock. <br />12. No one shall work or pass under the buckets or <br />booms al loaders. <br />Page 19 <br />i~ <br />• ~ • <br />