Laserfiche WebLink
• STATE OF COL OR4D0 giCNngn D. L~nnv..,,~n• <br />L~ ~ DEPARTMENT OF NATURAL RESOURCES <br />y ~ ~ Hares D. Sherman. Executive Director <br />MINED LAND RE(1LAMA'I'lON <br />~„ 723 Centennial Building, 1313 Sherman Street <br />i Denver, Colorado 80203 Tel. (3031 8923567 <br />C. C. McCall, <br />i:ovember 17, 1977 Administrator <br />Union Carbide Corp. <br />P.O. Box 1029 <br />Grand Junction, Colorado 81501 <br />ATTENTION: [•1r. J.D. Kirk <br />P.E: New Verde Mine. Our file 1177-292. <br />tfonogram Jo Dandy Mine. Our file 1177-293. <br />Ratah 30 P1ine. Our file 1177-294. <br />Bitter Creek Ptine. Our £ile 1177-295. <br />Burros Cline. Our file 1177-297. <br />~ Lumsden Kline. Our file 1177-298. <br />Radium Hill Mine. Our file 1177-299. <br />Dear Mr. Kirk: <br />iiiiiiiiiiiniiiiii <br />999 <br />h(ay tae request some additional information f.or clarification and ad~~quac}': <br />1) Please specify the portions of the legal descriptions which pertain to <br />. the surface affected areas. <br />2) Please provide separate acreages For each of the surface areas, where <br />applicable. <br />3) Mining Plan: Please address the extent of present and future surface <br />disturbance including access roads. Alsn, please include a statement <br />to t}te effect that the surface locations of the ventilation ainiays <br />will be put on the maps when such locations are determined. <br />4) Please shota adjacent landowners on the map. <br />5) Reclamation Plan: Please address the method of closing the portals and <br />ventholes. <br />We realize your probably don't have any topsoil, so would any fines be <br />available from the mining operation to spread over the fairly level <br />surfaces? <br />.~_-- y _~._ _ 7.. .. <br />