My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO28097
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO28097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:47:23 PM
Creation date
11/20/2007 8:54:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981023
IBM Index Class Name
Hydrology
Doc Date
3/13/2001
Doc Name
PHASE III MONITORING CHIMNEY ROCK MINE PN C-81-023
From
GREYSTONE ENVIRONMENTAL CONSULTANTS INC
To
DMG
Permit Index Doc Type
CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III Illlllluim ni <br />Envirorunnntal Consultants, Inc. <br />March l2, 2001 <br />Mr. Harry Ranney <br />Environmental Protection Specialist <br />Colorado Division of Minerals and Geology <br />215 Centennial Building <br />1313 Sherman Street <br />Denver- CO 80203-2273 <br />RECEIVEp <br />MAR 13 1001 <br />Division of Minerals and Geology <br />RE: Phase ~ Monitoring -Chimney Rock Mine (Permit No. C-81-023) <br />Dear Mr. Ranney: <br />Kaiser Ventures,Inc. herebysubmi[splansforthebeginningof[hePhaselllbondreleaseprocess. kaiser <br />has now entered year 9 ofthe liability release period and will begin hydrologic monitoring activities as <br />were being conducted in 1997 when monitoring was suspended. As such, i[ is proposed that monitoring <br />be conducted on a quarterly basis at surface stations S-l, S-2 and S-3 and at wells A-l, W-l, and W-5. <br />Water flows measurements will be made at surface stations and water level measurements will be made <br />at wells each quarter with semiannual water chemistry being collected in June and December. No <br />sampling is currently being proposed for December 2002 because the Phase III analysis and application <br />is proposed to be submitted in August/September 2002. No deep wells are proposed for sampling <br />because ofthe PHC analysis which was submitted in 1997 and 1999 that confirmed no significant effects <br />to bedrock aquifers. <br />Should you have questions or need additional information concerning [his report, please do not hesitate <br />to contact Mr. Mike Keegan at Kaiser or lerme know. <br />Sincerely, <br />~ ~~ <br />erry H. Koblitz <br />Project Manager <br />Attachments <br />cc Mike Keegan - Eagle 1\4ountain Mine <br />Dale Hockett -Elk River Construction <br />5231 South Quebec Street • Greenwood Village, Colorado 801 I I <br />Phone (303) 850-0930 • Fax (303) 721-9298 <br />Web Site: www.greystone-consultan[s.com • E-mail: greys[one@greys[one-consultants.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.