Laserfiche WebLink
Interoffice MEMORANDUM <br />to: File C-81-025 Quarterl and Inspection Reports <br />from: Byron G. Walker <br />subject: Review of 4'" Quarter 2000 Sedimentation Pond Inspection Report <br />Permit: C-81-025 <br />date: January 16, 2001 <br />The subject report was submitted on January 2, 2001, and received at the Division on January 5, <br />2001. The inspection was conducted on December 1, 2000. This review is conducted to <br />deternune compliance with Rule 4.05.6(13). <br />Were the ponds inspected for structural weakness? Yes <br />Were the ponds inspected for erosion? Yes <br />Were the ponds inspected for other hazazdous conditions? Yes <br />Is the report certified by a registered engineer? Yes <br />Is the sediment level reported? Yes <br />IS required maintenance reported? None Known to be Required <br />The dischazge from Pond T-2 was reported to be 30 cfs. The flow recorded in Division inspection <br />reports indicates flows azound 30 gpm. 30 gpm is consistent with the flows reported by the <br />permittee in DMRs. By letter, the perrnittee is asked to amend this report. <br />CC: Dan Hernandez <br />Files: C-8I-025, Sedimentation Pond Inspection Reports <br />C:\W PDOCS\NonhThompson\SedPndlnspRptRvw4Qti00.doc <br />