My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE65403
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE65403
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:11:12 PM
Creation date
11/20/2007 8:51:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Permit File
Doc Date
11/8/1988
Section_Exhibit Name
EXHIBIT L RECLAMATION COSTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1 <br /> <br />Rock Toe Buttress <br />Approximately 320,000 yd3 will need to be moved from Waste Rock Disposal <br />Area C to the buttress area at or near the end of the mining operations. Moving <br />will be accomplished using a 3 yds3 loader and 12 yds3 dump trucks. <br />The loader can load a 12 yds3 dump truck in 1.6 minutes (2 minutes will be <br />used for calculation purposes). <br />A. Buttress Placement <br />Each truck will have a 10 minute round trip. <br />Assume 6 trucks each making 5 trips per hour. <br />320,000 yds3 x 12 yds3/truck load = 26,661 truck loads <br />(6 trucks x 5 trips/truck/hour)/26,667 trips = 889 hours. <br />889 hours x S50/hour/truck x 6 trucks = $266,700 <br />889 hours x $45/hour = $40,005 <br />B. Grading <br />The buttress area is approximately 8 acres. <br />Assume the same grading costs as the waste rock disposal area, $4,716/acre. <br />$4,776/acre x 8 acres = $38,208 <br />C. Topsoil Replacement and Grading <br />The area for topsoil replacement is 8 acres. <br />Assume the same costs as the pit area, $1,878/acre. <br />$1,878/acre x 8 = $15,02A <br />PHASE 2 TOTAL COST FOR ROCK TOE BUTTRESS = <br />L-4 <br />$359,937 <br />(Revised 4/20/89) <br />(Revised 3/14/89) <br />
The URL can be used to link to this page
Your browser does not support the video tag.