Laserfiche WebLink
l <br />i <br />I <br />~~ <br />1 <br />Yd3• <br />Topsoil will be replaced using an International scraper with a <br />capacity of 23 yd3 at a cost of $95/hour. <br />Haul distance is approximately 1000 feet. <br />Grade is 2 percent. <br />Production is 250 yd3/hour <br />Adjusted for 0.83 job efficiency, production is 208 yd3/hour. <br />56,870 yd3 x 1 hour/208 yd3 x $95/hour = $ 25,975 <br />F. Topsoil Grading <br />Using a production of 1,089 yd3/hour. <br />56,870 yd3 x 1 hour/1,089 yd3 x 90/hour = 54,700 <br />TOTAL COST FOR MILL FACILITIES RECLAMATION ALL PHASES S 297,646 <br />(Not including revegetation) <br />L-16 <br />(Revised 4/20189) <br />SRevised 3/14/89) <br />