Laserfiche WebLink
<br />Mill Facilities <br />I A. Building Demolition and Disoosal <br /> Administration Building (60x60x15) 54,000 ft3 <br /> Laboratories (60x50x15) 45,000 ft3 <br /> Workshops/Warehouse (50x90x15) 67,500 ft3 <br /> Vehicle Maintenance Shop (60x130x30) 234,000 ft3 <br /> Crusher Building (75x70x75) 393,750 ft3 <br /> Screening Building (60x50x75) 225,000 ft3 <br />3 <br /> Grinding Building (50x70x50) 175,000 ft <br /> Filter Building (35x40x50) 70,000 ft3 <br /> Desorption and Gold Room (35x80x50) 140,000 ft3 <br /> Leach and Absorption Room (35x50x50) 87.500 ft3 <br /> Total Building Volume 1,491,750 ft3 <br /> Building removal costs are estimated at 5.13/ft3 <br /> Building Demolition and Disposal Costs 5 193,928 <br />t B. Floor Removal Costs <br /> All floors will be 4 inch thick concrete reinforced with wire <br /> mesh except the crusher building and screening building which will <br /> be 5 inch thick concrete reinforced with rebar. <br /> Administration Building (60x60) 3,600 ftz <br />Z <br /> Laboratories (60x50) 3,000 ft <br /> Workshops/Warehouse (50x90) 4,500 ftZ <br />' Vehicle Maintenance Shop (60x130) 7,800 ftZ <br /> Grinding Cuilding (50x70) 3,500 ftZ <br />I Filter Building (35x40) 1,400 ftZ <br /> Desorption and Gold Room (35x80) 2,800 ftZ <br /> Leach and Absorption Room (35x50) ~ 750 ftz <br /> Total 4 Inch Floor Area 28,350 ftZ <br /> 4 Inch floor removal costs are estimated at $1.69/ftz <br /> Total 4 Inch Floor Removal Costs E 47,912 <br /> <br />L-14 (Revised 4/20/89) <br />(Revised 3/14/89) <br />