Laserfiche WebLink
<br />' TOTAL HEAP NEUTRALIZATION COSTS/SEGMENT = $12,000 <br />Phase 1 Neutralization Costs <br /> 24.3 acres requiring neutralization. <br /> Each segment of neutralization is 2.65 acres. <br /> A total of 9 segments require neutralization at the end of <br />Ph <br />1 <br /> ase <br />. <br /> $12,000/segment x 9 segments = $108,000 <br /> <br /> Phase 2. Final Reclamation Neutralization Costs <br /> <br /> 16 segments requiring neutralization. <br /> $12,000/segment x 16 segments = $192,000 <br /> Pumoin4 Costs <br /> <br /> Cost of pump rental is $500/month for a 500 gpm pump. Assume 2 <br /> pumps will be rented. <br /> Phase 1 Pump Costs <br />I 9 months at $500/month x 2 pumps = $9,000 <br />h <br />0 <br /> /hour <br />Labor to run t <br />e pumps at $5.0 <br /> $5.00/hour x 24 hours/day x 30 days/month x 9 months = 532,400 <br /> Gas and maintenance at $3.00/hour <br /> $3.00/hour x 24 hours/day x 30 days/month x 9 months = $19,440 <br /> <br /> TOTAL PHASE 1 PUMP COSTS = $60,840 <br />' <br /> Phase 2. Final Reclamation Pumo Costs <br />16 months at $500/month x 2 pumps = $16,000 <br />Labor to run pumps at E5.00/hour <br />55.00/hour x 24 hours/day x 30 days/month x 16 months = $57,600 <br />Gas and Maintenance at 53.00/hour. <br />t <br />i <br />L-10 <br />(Revised 4/20/89) <br />(Revised 3/14/89) <br />