My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE65393
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE65393
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:11:12 PM
Creation date
11/20/2007 8:51:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005059
IBM Index Class Name
Permit File
Doc Date
1/19/2006
Doc Name
Response requesting approval of a SWSP
From
Office of the State Engiener
To
Weiland Inc
Section_Exhibit Name
31 T3N R67W of the 6th PM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Peter Wayland <br />January 19, 2006 <br />Page 3 <br />4. According to the plan the water pumped to dewater the site will be pumped to the Varra <br />Companies Pit No. 1 pit (Varra Pit) located to the north of the property. Water pumped <br />into the lakes shall not increase the surface area of the ponds beyond the area covered <br />under the augmentation agreement with the St. Vrain & Left hand Water Conservancy <br />District. If at any time it is determined that all evaporative depletions at the Varra Pit are <br />not being replaced, the dewatered water must be pumped directly back to the stream. <br />(Note that pumping the dewatering water back to the stream will create an obligation to <br />replace delayed depletions that result from dewatering.) <br />5. All pumping for dust control shall be measured in a manner acceptable to the division <br />engineer. <br />6. The approval of this substitute water supply plan does not relieve the Applicant and/or <br />landowner of the requirement to obtain a Water Court decree approving a permanent <br />plan for augmentation or mitigation to ensure the permanent replacement of all <br />depletions, including long-term evaporation losses and lagged depletions after gravel <br />mining operations have ceased. If reclamation of the mine site will produce a permanent <br />water surface exposing groundwater to evaporation, an application for a plan for <br />augmentation must be filed with the Division 1 Water Court at least three (3) years prior <br />to the completion of mining to include, but not be limited to, long-term evaporation losses <br />and lagged depletions. If a lined pond results after reclamation, replacement of lagged <br />depletions shall continue until there is no longer an effect on stream flow. <br />The Water Commissioner responsible for the administration of this plan is Mr. Scott <br />Edgar, 1735 Dolores River Drive Windsor, CO 80550, phone 970-686-0628. The <br />applicant shall maintain daily records of all diversions, replacements, and the amount of <br />water used for each particular purpose. The applicant shall provide a report of these <br />records to the division engineer and the water commissioner on a monthly basis on a <br />form approved by them. The accounting must be submitted within 30 calendar days of <br />the end of the month for which the accounting is being made. <br />In addition, the applicant shall submit a report from each entity making replacements <br />using fully consumable effluent; for this plan, that entity is the City of Longmont. The <br />report shall include an accounting of all wastewater plant water effluent controlled by <br />each entity, showing the total volume of water under its control at the various <br />wastewater treatment plants, and the amount committed to each of the recipients of the <br />water. <br />8. Replacement water released from fully consumable sources identified above must be <br />decreed for augmentation use. <br />9. Applicant shall follow the accounting protocol as referenced in the attached document <br />for the operation of this SWSP. <br />10. Approval of this plan is for the purposes as stated herein. Any additional uses of this <br />water must first be approved by this office. <br />11. The name, mailing address, and phone number of the contact person who will be <br />responsible for operation and accounting of this plan must be provided on the <br />accounting forms to the division engineer and water commissioner. <br />
The URL can be used to link to this page
Your browser does not support the video tag.