Laserfiche WebLink
The east half of the mined out east pit will be lined with clay and left as a dry <br />depression. The west half of the mined out east pit will be backfilled with the <br />native overburden materials onsite (primarily silty sand). <br />Gardeis Pit <br />Revised Groundwater Modeling Report <br />2of9 <br />