Laserfiche WebLink
6.4.7 EXHIBIT G -WATER INFORMATION <br />plan will construct a pipe to route this water past Cells C-D for the purpose of <br />routing the flow to the river. Details of this pipe are given in Exhibit F <br />Table G-1 <br /> Volume <br /> Monthly of Water <br /> Volume of Used for <br />Net Water Dust <br />Evaporation Extracted Control Total loss <br />[acre-ft] [acre-ft] [acre-ft] [acre-ft] <br />0.04 0.16 0.03 0.23 <br />0.04 0.16 0.03 0.23 <br />0.06 0.21 0.04 0.31 <br />0.09 0.32 0.06 0.47 <br />0.11 0.42 0.08 0.62 <br />0.18 0.64 0.12 0.94 <br />0.20 0.95 0.18 1.33 <br />0.18 1.06 0.20 1.44 <br />0.12 0.85 0.16 1.13 <br />0.08 0.21 0.04 0.33 <br />0.05 0.16 0.03 0.24 <br />0.04 0.16 0.03 0.22 <br />1.18 5.30 1.00 7.48 <br /> Volume of <br /> Replacement <br /> Water from <br /> 700 S Boise <br /> Ave <br />Month [acre-ft] <br />Jan 0.23 <br />Feb 0.23 <br />Mar 0.31 <br />Apr 0.47 <br />May 0.62 <br />June 0.94 <br />Jul 1.33 <br />Aug 1.44 <br />Sep 1.13 <br />Oct 0.33 <br />Nov 0.24 <br />Dec 0.22 <br />totals 7.48 <br />Gardels Pit Rev AR-1.0 <br />Regular 112 Permit Application <br />