Laserfiche WebLink
Conclusion <br />Sedimentation Pontl 015 does meet or exceed tfie design and performance requirements of • <br />the CMLRB's regulations. Seneca will inspecC the pond quarterly to evaluate :>tructural <br />integrity, storage capacity conditions, and remedial work requirements in ac:cordance with <br />the approved mine permit. Therefore, pursuant to Rule 4,05,6(101, the above is the <br />Sedimentation Pond 015 as-built certification report, <br />I <br />s <br />13-5D-4 Revised 05100 <br />