Laserfiche WebLink
as established reclaimed areas awaiting reclamation bond release, are inspected weekly. Any <br />deficiencies noted during any of the inspections were corrected promptly. <br />C. RESULTS AND INTERPRETATION OF ANY STORMWATER MONITORING.. <br />Sediment Pond 001 and 007 water discharges was tested weekly for the parameters listed in our <br />NPDES permit. All samples passed the water quality parameter set by our NPDES permit. <br />Ponds 008 failed the one and only W ET test for the year. Cause was believed to be the practice of short <br />circuiting 'clean` pit water through the discharge structure without letting it have sufficient time to <br />stabilize. The practice of short circuiting the pit water through the discharge structure was immediately <br />suspended and no further discharge of water was allowed through Pond 008. <br />There was no significant storm events in 2008, All ditches and sediment ponds functioned properly. <br />Pond 002-008 were basically dry throughout the year. Pond 001 and 007 continue to discharge all year <br />long and water quality is measured and recorded as per our NPDES permit. <br />Monitoring Results Attached? No <br />D: \data\wpdata\storm\Olsumprp.doc 3-3 <br />