Laserfiche WebLink
EXHIBIT L <br /> RECLADIATION COSTS <br /> The two consecutive phases requiring the greatest amount of reclamation <br /> work are Phases 1 and 2. In addition, 1.65 acres will be disturbed by stock- <br /> piles for part of the life of the mine. Of the 3.55 + acres to be revegetated <br /> in Phases 1 and 2, all are slope areas that will require some backfilling and <br /> grading to create a topography that is compatible with the final land use. <br /> Reclamation costs are based on the following data: PER ACRE <br /> 1. Backfill and reshaping, 4 hrs @ $50/hr. $200.00 <br /> 2. Final grading or ripping, 5 hrs @ $50/hr. $250.00 <br /> 3. Grass seed mixture, 21.6 lbs/acre @ $5/lb $108.00 <br /> Fertilizer based on soil test dificiencies - estimate 20.00 <br /> ' Mulch 65.00 <br /> Labor, 16 man hrs/acre @ $6/hr. 96.00 <br /> TOTAL 269.00 <br /> ' 4 . Seed mixture .drilling or broadcasting and <br /> fertilizing, 2.5 hrs @ $40/hr $100.00 <br /> t 5. Trees and shrubs , $240.00 <br /> Labor, 8 man hrs/acre @ $6/hr 48.00 <br /> TOTAL 388.00 <br /> ' Thus, reclamation cost for the combined acreage in Phases 1 and 2 plus <br /> ' stockpile area are as follows : <br /> 1. Backfill and reshaping, 3.55 + acres x $200 $710.00 <br /> ' 2. Final grading and/or ripping, 5.20 + acres x $250 $1,300.00 <br /> 3. Revegetation - grass mixture, trees, fertilizer, <br /> mulch, labor, 5.20 + acres x $269 $1,398.80 <br /> 4. Seed mixture drill or broadcast and fertilizing <br /> S.20 + acres x $100 $520.00 <br /> 5. Trees and Labor 5.20 + acres x $388 $2,017.60 <br /> ' TOTAL $5,946.40 <br /> We recommend that bond be set at $6,000. <br /> ' 31 <br />