Laserfiche WebLink
Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />Mazch 2005 Monthly Report <br />Page 3 <br />Table 2 -Mazch 2005 Tailing Disposal Area Piewmeter Depth to Water <br />Measurements <br />Piezometer Date Depth to Water <br />feet Total Depth (fr) Volume of <br />Water fr <br />P6 3/31/05 D 72.46 0.00 <br />P7 3/31/05 9235 92.50 0.15 <br />P8 3/3]/05 96.90 97.51 0.61 <br />P9 3/31/05 71.73 72.30 0.57 <br />P10 3/31/05 57.47 5830 0.83 <br />P11 3/31/05 41.28 41.80 0.52 <br />P12 3/31/05 41.63 41.71 0.08 <br />P13 3/31/05 40.97 4134 0.37 <br />P14 3/31/05 D 41.24 0.00 <br />P15 3/31/05 D 41.10 0.00 <br />Water Treatment Plant Sludge Management Year to Date <br />DATE QUANTITY MANAGEMENT <br />MARCH 2005 392.5 TONS Sludge transferred from drying pad to tailings <br />impoundment. <br />Should you have any questions or comments, please do not hesitate to contact either myself (719) <br />379-0799 or Mr. Bill Lyle (303) 324-2630 or (970) 325-4482. <br />F. Madrid ' <br />onmental Coordinator ill <br />Cc: Bill Lyle <br />file <br />