Laserfiche WebLink
<br />QUARTERLY POND INSPECTION REPORT <br /> PAGE 2 OF 2 <br />OPERATOR: MINREC, INC. QUARTER: FOURTH QUARTER 1993 <br />MINES: NORTH THOMPSON CREEK DATE OF INSPECTION: DECEMBER 26, 1993 <br />POND IDENTIFICATION LONG POND T-1 T-2 <br />TYPE OF POND TREATMENT TREATMENT TREATMENT <br />STATUS DURING INSPECTION: <br />APPROXIMATE WATER LEVEL FULL FULL FULL <br />SED (~ total storage) N/A N/A N/A <br />OUTFLOW (cfs) TO T-1 TO T-2 0.049 <br />FEATURES PROBLEM COMMENTS <br />EROSIONAL: YES NO <br /> <br />Rills & Gulleys X <br />Inadequate Vegetation X Long Pon d Was Seeded In Fall 1993 <br />Outlet Channel Erosion X <br />Burrows x <br />Other X <br />STRUCTURAL: <br />Differential Settling X <br />Cracks or Slides X <br />Seepage X <br />Other X <br />APPURTENANT STRUCTURES: <br />Defective Spillways X <br />Dewater Device Clogged x <br />Faulty Gates, Etc. X <br />Other X <br />ADDITIONAL COMMENTS: A small seep surfaced <br />pond. This seep is not a concern regarding near the east end of the long <br />the integrity of the pond. <br />MAINTENANCE REQUIRED: None <br />NAME OF INSPECTOR: Jim Stover, P.E. 19230 <br />5~~"c~2 <br />