Laserfiche WebLink
i + ~ • <br />RECLAMATION COST SUMMARY cont'd sheet 3 of 4 <br />H. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.l Task Description I Cost (S) <br />I------ ~I_»_ <br />I N1A <br />I I <br />I I <br />I I <br />Subtotal (H): <br />i I. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.l Task Description I Cost (S) <br />--I-------- --------------I- -- <br />30 I Regrade clean water dvrsn. 3000'x6'x2' = 1334c.y.l 5218 <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />i I <br />I I <br />Subtotal (I): 5218 <br />J. EARTHWORK - TOPSOILlSUBSOIL REPLACEMENT <br />Task No.l Task Description <br />11 <br />12 <br />Replace 6" topsoil on Heap leach pad. 160'x60'. <br />and on the vat leach pad 25'x30' 10.350~.~ <br />Topsoil replacement on diversion ditch included <br />in task 10. <br />All other areas are pre-law disturbed and do not <br />require topsoil replacement since none was saved. <br />Haul 91.6c. y. topsoil @ f12.00(c.y. to site. <br />Assume eight 40-mile round trips from Durango <br />with a 12c.y. dump truck @ 533.32/c.y. <br />Operator assumes 100c.y. stockpiled currently. <br />leaving a 5~1.6c.y. deficit to be imported. <br />Cost (f) <br />S30 <br />54.151 <br />Subtotal (J): f4.181 <br />