My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO27950
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO27950
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:47:17 PM
Creation date
11/20/2007 8:41:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
Hydrology
Doc Date
3/8/1988
Doc Name
CDPS GENERAL PERMIT FOR COAL MINING FACILITIES SURFACE RUNOFF ONLY AUTHORIZATION TO DISCHARGE UNDER
Permit Index Doc Type
NPDES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PAST II <br />Page 14 <br />• Permit No. COG-850000 <br />A. MANAGEMENT EEQIIIREMENTS <br />4. Submission of Incorrect or Incomplete Information <br />Where the permittee failed to submit any relevant facts is a permit <br />application, or submitted incorrect information in a permit <br />application or report to the Division, the permittee shall promptlq <br />submit the relevant application information Which was not submitted or <br />any additional information needed to correct any erroneous information <br />previously submitted. <br />5. Bypass <br />The permittee may allow any bypass to occur which does not cause <br />effluent limitations to be exceeded, but if and only if it is for <br />essential maintenance. to assure efficient operation. <br />Bypass is prohibited, and the Division may take enforcement action <br />against a permittee for bypass, unless: <br />(a) Bypass was unavoidable to prevent lose of life, personal injury, <br />• or severe property damage; and <br />(b) There were no feasible alternatives to the bypass, such as the <br />use of auziliary treatment facilities, retention of untreated <br />wastes, or maintenance during normal periods of equipment <br />downtime. This condition is not satisfied if the permittee could <br />have installed adequate backup equipment to prevent a bypass <br />which occurred during normal periods of equipment downtime or <br />preventative mainteoaace; and <br />(c) The permittee submitted notices as required in 'Bypass <br />Notification', Part II.A.6. <br />6. Bypass Notification <br />If the permittee knows in advance of the need for a bypass, a notice <br />shall be submitted, at least tea days before the date of the bypass, <br />to the Division and the Environmental Protection Agency (EPA). The <br />bypass shall be subject to Division approval and limitations imposed <br />by the Division sad EPA. <br />
The URL can be used to link to this page
Your browser does not support the video tag.