My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE65081
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE65081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:10:57 PM
Creation date
11/20/2007 8:41:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004067
IBM Index Class Name
Permit File
Doc Date
11/21/2005
Doc Name
Exhibit 189-191
From
City of Black Hawk
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />OFFICE OF THE STATE ENGINEER <br />Division of water Resources <br />Deparunentof Naaral Resources <br />1313 Sherman Stree4 Room 81a <br />Oenva, Gotorado 8a2a3 <br />Phone (36318fi635at <br />FAX I3a3) 866.3569 <br />W,NV•WatarJrBtGM.er <br />R~CEtVEp <br />NDV t 62004 <br />dvtalcn ~f Mi6er61a and Csalagf <br />Response to Reclt~ttladon Permit Application Consideration <br />DATE; November 18, 2004 <br />TD: Thomas A. Schreiner, t~tvlronmantel Protection 6peclalist <br />GC: Division 1 Office, District 7 Water Gommlesioner <br />~ + <br />.`s + <br />r <br />6iY asnu <br />Garunor <br />a~rau Georee <br />Fvaa,ave akecrnr <br />Hai A.9mpson, P.E <br />Sere Ea~neer <br />FROM: loans Comaniclu, E.I.T, <br />r <br />Rc: MMRRQuarry,Fllehlo,M-200a-007 ES~oCtP~»+•~ <br />Operator: Gleai Creek Dlstrlvt W afar Prov(dt3re. LLC303.773-1009 <br />Confect: Banks and Gesso, LLC-Paul aeseo,303-274-4277 <br />Sacllon 26, TWp 3 South, Rng 72 West, Bth P.M., Gllpln Gounty <br />CpNOffIDN$ FOR APPROVAL <br />~ The proposed operation does not anticipate axpo6lna aroundwatar. 711srefore, exposure of around <br />water moat not occur dudn0 or after mining operetiorts. However, this project will effect two unnamed <br />drelnagevraya (surface water} totaled In the query area and that will flow only as a result of rainfall or <br />snowmelL The applicant must show that no Injury to other vested water rights will occur as a result of <br />this quarry project. <br />^ The proposed opeation will consume Qrouhd water hy: ^evaporatton, [] dust conhoi, L7reciamatlan, <br />^watar removed M the mined produoL L7 proconcing, ^ other, <br />Prior to InlUatlon of these uses of ground water, the epplleant will need to obtain either a gravel pit or <br />other type of welt permit, as applicable. However, prior to obtatning a permit, an approved water supply <br />plan or decreed plan far auBmentedon is required. <br />^ Prior to approving a welt permit, the eppllcartt must conduct a Fleld inspection of the alts and document <br />the locations of all wells Wlthln 600 feet of the permit azea, The applicant moat then obtain a waiver of <br />objecgon from all well owners with wells withlh 600 feet of the permit area or request a hearing before <br />the State Engineer. <br />^ The proposed aperaGon may have potenttet Impact an exfstinp water rights near the project location. <br />Applicant needs to demonstrate that the proposed proJeet vdli not alter or Impevt the hlstodo operation aF <br />existing water fights. <br />^ , The applicant has Indicated p18ns to use other Water for purposes at the permit site, The source <br />of water for this use fs to be oblalned from Applicant reads to document that this water was <br />diverted ]n priority under a water right decreed for ouch industrial use. Applicant should contact the <br />water commissioher for further Information. <br />® The applicant has Identified that the only Water requtrement for this project will be For dust control..All <br />water will be trucked into the alts. If water will be used for any othef purpose at this site, the applicant wAl <br />need to document that the water was obia)ned from a toga! source, a!' th® water was tlfvarted in prlonty <br />under a water rieht decreed for such Industrlat use. <br />COMMENTS: if etormweter runoff Is intercepted by thle operation and is not diverted or captured In ptlarity, It <br />must be released tv the stream system within 72 hours. This may require a discharge permit from CDPHE- <br />WQCp, Omerwisa, the operatorwitl need to make replacements for evaparartan. <br />The applicant may contact the State Engineer's Office with any questions. <br />Exhibit B <br />
The URL can be used to link to this page
Your browser does not support the video tag.