Laserfiche WebLink
' ~ O PART II <br />Pape 8 of 17 <br />Permit No: CO-OD27154 <br />--__ ~ -A. .MANAGEMENT REQUIREMENTS <br />1. Change in Discharge <br />All discharges authorized herein shall be consistent with the terms <br />and conditions of this permit. The discharge of any pollutant <br />--- identified in This permit Tore frepuen[ly Chan or at a level in <br />excess of that authorized shall constitute a violation of [he permit. <br />Any anticipated change in discharge location, facility expansions, <br />production increases, or process modifications which will result <br />_ in new, different, or increased discharges or pollutants must be <br />reported by submission of a new NPDES application or, if such changes <br />will no[ violate the effluent limitations specified in this permit, <br />by notice to the State Water Quality Control Division of such changes. <br />Process modifications include, but are not limited [o, the introduction <br />of any new pollutant not previously identified in the permit, or any <br />other modifications which may result in a discharge of a quantity or <br />quality different from [hat which was applied for. Following such <br />notice, the permit may be modified to specify and limit any pollutants <br />not previously limited. <br />,~..___ ~:~_3;=.Noncompliance <br />(A) Definitions <br />(1) Upset: An exceptional incident in •.vhich there is unintentional <br />and temporary noncompliance with technology-based permit <br />effluent limitations because of factors beyond the reasonable <br />- __---_~ control of-.the permittee. <br />(2) Bypass: The intentional diversion of waste streams from any <br />portion of a treatment facility. <br />(3) Severe Property Damage: substantial physical damage to property, <br />to the treatment facilities to cause them to become inoperable, or <br />substantial and permanent loss of natural resources which can <br />reasonably be expected to occur in the absence of a bypass. It <br />does not mean economic toss caused by delays in production. <br />~~-(B) Notification <br />(1) If, for any reason, the permittee does not comply with or mill be <br />unable to ccmply with any maximum discharge limitations or <br />standards specified in this permit, the permittee shall, at a <br />minimum, provide the Water Quality Control Division and EPA with <br />the following information: <br />a) A description of the discharge and cause of noncompliance <br />b) The period of noncompliance, including enact dates and times <br />and/or the anticipated time when [he discharge will return to <br />compliance; and <br />c) Steps being Caken to reduce, eliminate, and prevent recurrence <br />of the noncomplying discharge. <br />1/31 <br />