Laserfiche WebLink
<br />In 1999 Colowyo submitted TR-49 which allowed for a modification to the <br />West Pit disturbance area. The TR-49 added $31,876 additional calculated <br />liability to the $16,000,000 bond, leaving a remaining contingency of <br />$297,603. <br />A description of all lands currently disturbed, all lands to be disturbed <br />during the next permit term, and the schedule of disturbance is included <br />in Exhibit 13, Bonding Information. <br />The calculations for the bond amount, all associated plans and designs, <br />cost documentation and summary table are included in Exhibit 13, Bonding <br />Information. <br /> <br />3 . 0 2 - 3 RBVISIOfI $IlbrtdG6d 7 - ) _9 <br />aerlabn No. -1' R- y 9' <br />._ <br />