Laserfiche WebLink
<br />PROJECT IDENTIFICATION <br />Task # : 002 <br />Date : 12/12/2001 <br />User : WHE <br />Agency or organization name : DMG <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State :Colorado <br />County : Ouray <br />Site : Zmk Gravel Pit <br />PermiUjob# : M-1991-146 <br />Abbreviation :none <br />Filename : M146-002 <br />Permit or other job action :General 110c bond review <br />Task description :Close breach in historic flood protection dike <br />HOURLY EQUIPMENT GOST <br />Basic machine :Cat D5C Serves 3 - 5P <br />Blade type :Power Angle Titt <br />Attachment no. 1 : BOPS Cab <br />Attachment no. 2 : NA <br />Horsepower: 90 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization °lo <br />Cost Breakdown : Ownership cosUhour : $12.09 NA <br />Operating cosVhour : $21.12 100 <br />Ripper op.cosUhour: $0.00 NA <br />Operator cosVhour: $27.99 NA <br />Total unit cosUhour : $61.19 Total fleet cosUhour : $61.19 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 237 LCY factor : NA volume: 237 LCY <br />Source of estimated volume : 40'L <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Average push distance: 100 Teet <br />Unadjusted hourly production : 306.9 LCY/hr <br />Material consistency description ~. <br />Compacted fill or embankment <br />dike 20'base ' 8'H <br />Average push gradient : 0.00 % (pos) <br />Average site altitude : 7,200 feet <br />Material weight : 2,900 Ibs1LCY <br />Weight description <br />Sand and Gravel - Drv <br />JOB TIME AND COST <br />Fleet size . 1 Dozers) <br />Unit cost: $0.561 1LCY <br />Condition Correction Factors Source <br />Operator skill : 0.75 (avg.) <br />Material consistency : 0.90 (Cat HB <br />Dozing method : 1.00 (gen.) <br />Visibility: 1.00 (avg.) <br />Job efficiency: 0.83 (1shiR/da <br />Spoil pile : 0.80 ((nd-r~ <br />Push gradient : 1.00 (Cat HB <br />Altitude : 1.00 (Cat HB <br />Material weight : 0.79 (Cat H8 <br />Blade type : 1.00 (PAT) <br />Net correction : 0.36 <br />Adjusted unit production 109.05 LCY/hr <br />Adjusted Fleet production : 109.05 LCY/hr <br />Total job time : 2.17 Hours <br />Total job cost : $1J3 <br />