Laserfiche WebLink
3-8 <br />• <br />L <br />Very little soil can be salvaged from <br />units to be affected are DL and TRDE. <br />mended for salvage. Map unit TRDE is <br />topsoil salvage; in the few places why <br />soil as possible generally about 6 to <br />waged. <br />the mine portal area. tdap <br />Map unit DL is not recom- <br />generally too steep for <br />are slopes permit, as much <br />18 inches) will be sal- <br />Soils will also be salvaged in the sediment pond and waste rock <br />disposal areas. Map units to be affected are RiAB, TRDE, and DL. <br />Map unit RiAB can be salvaged to 12 inches. Map unit TRDE can <br />be salvaged from 6 to 18 inches only where slopes permit. Ldap <br />unit DL is not recommended for salvage <br />material can be salvaged in this area <br />of material to be salvaged in this area. <br />3.2.3 Topsoil Storage <br />About 1 acre-foot of <br />Table 3.3-3 shows volumes <br />Two topsoil storage areas will be located in the vicinity of the <br />waste rock disposal area"~ure 2.2-9)_? Vegetation will be <br />stripped from the storage areas prior to stockpiling. Both stock- <br />piles will comprise approximately 1.3 acres. The design and <br />management of topsoil stockpiles is addressed in detail in Section <br />2.4.3. <br />The salvaged soil should have good revegetation characteristics. <br />Soils will be imperfectly mixed, but the expected volume weighted <br />average characteristics and range in characteristics are shown below: <br /> <br />