Laserfiche WebLink
" BASIN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION lOR11 <br />/- POnd_ GOLDEN EAGLE SAE 11 5 11A NPDES No. CONTAINMENT. DITCH <br />1. Date of Inspection -~_,e ,.2 ~ , /iS~ <br />~. <br />EMBANICMEITP - - <br />~1. - Adequacy of the vegetative cover: Excell~e~.~ Moderate, Pew, poor <br />2. Erosion forming gullies: E:tensive, Sosie, Very law, lion ~ <br />3. Is wave action causing erosion: <br />On the upstream embankment? Yes No aG <br />At the principal spillway inlatTiv.~~ Yee No <br />4. Erosion of the downstream toe of the embankment? Yes No_ C <br />The cause of the erosioln//pvla attributed to: <br />5. Ia seepage occuiiingrthYbu~h the daa? Yes No I! yes <br />could this seepage cause potential instability? Yes Mo <br />Explain: <br />PRINCIPAL SPILLWAY //o~rz <br />1. Is the principal spillway system in working order? Yes Mo <br />2. Is the inlet free of d~bri~r and restrictive ssater.lal?Yes Mo <br />,e <br />-~ 3. Is the discharge outlet free of restrictive mater:lal? Yes Mo_ <br />• 4. is erosion occurring at"/thi discharge outlet? Yea Mo If <br />yes, <br />evnluate the severity: Extensive Moderate Juat starting 110 <br />URGENCY SPILLMAY N o r £ ' <br />1. is the overall emergency spillway system capable of passing <br />design storm discharge? Yes No <br />2. Does it appear ae it the asbrgency'spillway has <1lscharged water <br />since the last inspection? Yea No <br />3. Is erosion occurring at any section of the e:nerga:ey ^pillway? <br />Yea No Describe the <br />extent . <br />SEDIl1):NT STORAGE CAPACITY <br />1. Has the design storage capacity of the reservoir been surpassed? <br />Yes No~_ I! yes, <br />explain: ~~ <br />~'"'" ,•' Please add an a <br />~.~• y pecial coaeents concerning potentially dangerous <br />problems on the back o! this sheet. ~ //JJ <br />Inspector_1y~~~/„/.~ .Co,~t <br />