Laserfiche WebLink
Mr. Harry Ranney <br />August 8, 1990 <br />Page 2 <br />Cameo Refuse Disposal Area No. 1 piezometers were drilled <br />through refuse material to a depth of 30'. Approximately 5' of <br />each hole was cased with 4" steel pipe. A 2" PVC pipe was <br />installed and packed with gravel. There are three (3) <br />piezometers on the CRDA No. 1. <br />Please let me know if you need any further information on these <br />piezometers. <br />Sincerely, <br />LarYy M. Reschke <br />Project Engineer <br />LMR:th <br />