My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO27924
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO27924
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:47:16 PM
Creation date
11/20/2007 8:38:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Hydrology
Doc Date
3/13/2000
Doc Name
4th Qtr 1999 Inspections
From
SENECA COAL CO
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PSAIODIC INBPECTION FORN <br />Stockpoads or Sumps <br />INSPECTOR'S NAME: M'_ha 1 Al av't a <br />FACILITY CONFIGURATION: Steckpend <br />SITE NAME: T-2B <br />MINE NAME: c n a TT <br />MINE I.D. NO.: c-RO-005 <br />1 <br />2 <br />"Boils" beneath stream or ponded water: <br />3. Cracks or scarps on treat: <br />4. cracks or scarps on elope: <br />5. Sloughing or bulging on elope: <br />6. *Major erosion problems: <br />7. Surface movements in valley bottom or on hillside: <br />8. *Eroeion of toe: <br />9. *Water impounded against downstream toe: <br />10. Existing embankment freeboard: ATnroximately <br />11. Increase Decrease in water level: No change <br />12 <br />13 <br />14 <br />DATE: 11,/02/99 <br />DATE LAST INSPECTION: 09/~~99 <br />LOCATION: SE3rNF.)i Sec 2 T5N R87W <br />LOCATION: 7.1 mi c of Hayden. GO <br />OWNER'S REP.: Brad Brown, Gen Mqr <br />Angle of elope: 3:t upstream, a:1 downstream <br />*Seepage (specify location, color, and approximate volume) <br />At isolated points on embankment elopes: <br />At natural hillside: <br />over widespread areas: <br />From downstream foundation area: <br />Cracks, bulging, or erosion on upstream face: <br />Spillway erosion: <br />*Clogging <br />Spillway channels: <br />Diversion ditches: <br />Yee <br />Yee <br />Yee NO <br />Yee N® <br />Yee <br />Yee <br />Yee N~ <br />Yee '~ <br />Yee <br />Yee <br />Yes <br />Yee <br />~ feet <br />feet <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />Yes ® N/A <br />Yes ®o N/A <br />Yee N/A <br />~ <br />Yee N/A <br />*Major adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse <br />conditions noted in these items should normally be described (extent, location, volume, <br />Total = 7:t N/A <br />etc.) in the apace on the back of this sheet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.